Knit/Crochet Project Time Estimator

Estimate how long a project will take based on its total stitch count and your typical stitching pace. Time your own swatch for a few minutes first to get an accurate personal pace.

How the estimate is built

Everything comes from one number of stitches divided by one pace. There is no hidden fudge factor:

total stitches = stitches per row × rows
minutes        = total stitches / pace
days at 1 h/day = ceil(minutes / 60)

The defaults - 120 sts, 200 rows, 30 sts per minute - give 24,000 stitches and 800 minutes, shown as 13h 20m, or 14 days at an hour a night. A pace of 30 is one stitch every two seconds, so a 120 stitch row takes four minutes flat. Drop to 20 sts/min and the same blanket becomes 20 hours.

Getting your own pace, and what it leaves out

Finishing is not counted anywhere. Casting on, seaming, weaving in ends, sewing on buttons and blocking add hours to a garment, and on a many-colour project the ends alone can take an evening.

Frequently asked questions

How long does it take to knit a blanket?

A 24,000 stitch throw at 30 sts/min is about 13 hours of knitting. Bulky yarn cuts the stitch count sharply; the same size in 4-ply can pass 60 hours.

What is a normal knitting speed in stitches per minute?

Around 20 to 40 for a comfortable knitter on plain stocking stitch. Fast continental and lever knitters exceed 60, and competition speeds go past 100.

Is crochet faster than knitting?

Per stitch it is usually slower, but a crochet stitch is taller and wider, so far fewer are needed to cover the same area. Enter your own counts for both.